The Helix Continued…

I hope everyone is having a great Holiday Season. While I have been busy with family and work, I have had a chance to continue on the helix. Just not as much as I had hoped. I guess that’s the way it goes.

I did get the second ring of the helix installed. Tracks in and wired and successfully tested. Which leads to some thoughts on the way helixes are monitored.

This has been and continues to be one of the great divides on using a helix. Many will tell you that they would never use one for a couple of reasons. First, they are a tremendous real estate suck. Yes, yes they are. I have devoted about 30 square feet to mine. That’s a lot of space, especially if you are working in tight quarters. Fortunately I have the space.

The second is, you can’t see what’s going on and have no idea if the train is even moving.

My solution to that one.

One could just leave the helix open so that you could see what’s happening. My sense of aesthetic won’t allow me to have this great big monster hanging out in the open. I don’t know, maybe we should chalk it up to OCD.

My plan is the following. First the progress.

Second loop of helix in.

You can see above that both tracks end in the same place. Not something that happens when laying track with two different diameters. They were cut off together because this is the end of the first detection block. There will be a three over three signal at the entrance to the helix top and bottom. The upper signal head will show occupancy for the first section as the train navigates up or down. The lower the second section. The operator will have the visual cue of the signals so that they know there is movement.

If this isn’t enough, I have a two camera monitor that the operator can watch.

Monitor and cameras for the helix.

You can choose between the two cameras or have a split screen of both. The cameras will be placed (I hope) so that one can see the entire helix as well as the upper and lower return loops. Will see how that works out. I had picked this up at Lowes years ago on clearance. When I got it home and played with it I really liked it. Went back to get another but they were gone. The newer security systems are way too expensive (my opinion) for what I need. Mainly because they all have DVR’s built in. Don’t need a replay of the train in the helix.

Any ways, my solution to the problem.

I did get the third ring assembled and set into place.

Third loop set in place.

One thing that struck me was, with only two loops, it didn’t strike me as a helix. With the third in place it now “looks” like a helix.

Still have several family functions to attend through new years, so there won’t be much work done downstairs. After the 1st though I should be back at it.

Till then, Happy New Year…

 

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.