Number 100…

Yup, finally hit post number 100. Thought I would have hit this a lot sooner, but better late then never.

When reading up on how to do a website/blog, the recommendation was two posts a week to hold readers interest. That means I should have been here within the first year. But I have never been one to throw things out there just to hit a number. And than there’s that whole thing about having something worth writing about. Life happens and you can’t get things done if you don’t have time.

I do have a bunch of stuff to report on. Various things on the layout as well as things on the work bench. And I will, as we are now on the other side of my daughters wedding. You may remember the candy cart, still have it if you’re interested. The wedding itself will be it’s own story here as it was trackside in Red Wing, MN.

As far as the workbench projects versus work on the layout goes, it tends to lean towards the workbench projects.  I’m having a hard time getting into the mindset of working on the railroad. I still have a trade show coming soon, which means 8 days in New York. After that I’m thinking that the next project needs to be the helix when I get back. Getting the helix done means that I can get the rest of the track and wiring done. I have played a little with scenery but as I had mentioned a long time ago, I would prefer to get one thing done before moving on to another.

And with the helix in place and most of the upper deck track work done, at least to the upper return loop, I can start orbiting trains between the two loops. With that in place I will then want to get the scenery done. Because you don’t want trains just running on the “Plywood Pacific”.

One other thing I’m working on has to do with this site. There is far more content that can be added to dress things up, I’ve just been afraid to mess with things with the fear that I’ll somehow crash it. Got to get over it and just do it.

So that’s it. Happy One Hundred. Next time there will be something more then me just rambling.

Till then, have fun and Happy Railroading…

Go back

Your message has been sent

Warning
Warning
Warning
Warning

Warning.

Disappointment and a Change of Plans – A Rant…

I recently received some disappointing news which has led to a major shift in plans. No, I’m not changing the layout.

After waiting about a year I finally got the official word from Atlas (atlasrr.com) about the fate of their signal system. I don’t know if you are aware or not but a little over a year ago they had sudden problems with their Chinese suppliers. They aren’t the only ones, as I have heard from various industries of manufacturing plants suddenly closing up in China. The companies then scramble to retrieve plans, patterns, molds, whatever from the plants. The problem is they are usually just gone.

You may or may not recall that my plan was to use their signal system on my layout. It was a simple system to hook up. Not as in depth as others, but would give me basic block occupancy and a little animation. One could “see” around the corners as to the status of the track.

As well as having their circuit boards for detection and signal control which were made in China, Custom Signals (customsignals.com) were supplying them with the type G signal masts. Custom Signals is closing up shop. Not sure where Atlas is getting their signal masts from now.

The word from Atlas is that they will be selling the signal masts (type G) as well as a block detector.  Great, except I can get type G masts from other suppliers cheaper and the detection units only work with standard DC. No offense to those staying the course with standard DC, God bless your heart, but really! Plus they are not offering the signal controller, which is the heart of the system.

So, after looking around at what is available, I’m going to have to buck up and go with the Digitrax (digitrax.com) system. The basic layout wiring that I have in place will easily work with their (Digitrax) system,  it’s just more complicated. It has far more features than I need, although in the future when things are nearing completion, as in scenery and such, I can look at using more of the features. You know, the layout is never done. As to cost, it’s more or less a wash.

That’s it, that’s the major change. Not really a big one as signaling is still in the future and I have time to plan for it. But it’s kind of annoying, as I have a bunch (not enough to finish the layout) of the Atlas masts/detectors/controllers on hand and now they are worthless. who knows, maybe Ebay.

Thanks for listening, till later…