Walther’s Showroom…

Our second attempt at seeing the Walther’s showroom was far more successful then our first. We got there about 11:00 in the morning and walked on in, check that one off my bucket list.

Walther's home office / show room / warehouse.
Walther’s home office / show room / warehouse.

Upon entering the showroom you are greeted by a large HO layout. It is beautifully done, obviously highlighting Walther’s products. Off to the side is a decent sized N scale layout, again very well done.

As you enter the showroom.
As you enter the showroom.
The N scale layout.
The N scale layout.

Around the perimeter are display cases with finished structures, didn’t ask but I assume that they are probably the ones used for the photos for the Walther’ catalog. One case was more of a history case. It had old casting blanks and pieces cast from them, old office equipment, old kit parts and a collection of William Walther’s (the founder of the company) office and personal items.

Blanks for engines castings alongside the cast pieces.
Blanks for engines castings alongside the cast pieces.
Ye olde billing machine.
Ye olde billing machine.
In the memorabilia showcase.
In the memorabilia showcase.
More items from the case. Mr. Walther's personal items.
More items from the case. Mr. Walther’s personal items.

The merchandise on the floor isn’t anywhere as extensive as you would think. Pretty much all HO (sorry to all who model other scales) and mainly engines, freight, passenger and structures. All Walther’s products. Of course when you have the whole warehouse behind you, you don’t need a huge display space. They have two workstations with all the catalogs and computers to check stock. Write down what you want, hand it to the guys at the counter and they run out and get it for you.

Two workstations where you can check stock before ordering.
Two workstations where you can check stock before ordering.
The main counter and pick up desk for your in showroom orders. Chris, who gave us a tour of the facilities, is to the right.
The main counter and pick up desk for your in showroom orders. Chris, who gave us a tour of the facilities, is to the right.

While I was looking over the shelves, my wife hit the catalogs and computers. She had gotten me a static grass applicator for Christmas, but didn’t understand exactly what it did. I had explained how it worked, so when we hit the showroom, she wanted to get some static grass for it. As we were paying for the order, we got to talking with Chris, the guy who was helping us. When he heard we were from out of town, he asked the magic question. Would you like a tour of the facility?

Absolutely! So with the visitor badges clipped to our coats, we started our tour. Eyeing my camera, Chris let me know that although you can take pictures in the showroom, the camera was forbidden everywhere else in the building.

Having worked in a auto parts warehouse in my younger years, I was very familiar with the operation in the back. The way orders are generated, filled and shipped. Nothing new here. It was still  great to see the workings in back, but Chris being the seasoned tour guide, was able to make it all interesting. He supplied the whys and hows of the way things were done, but more importantly, some history and trivia of the place.

We were shown everything, front offices, employee spaces, overstock spaces, general warehouse and shipping. The only place that you are not allowed is New Product Development. Wasn’t a problem, but later as I thought about it, it would have been cool to see what’s coming. As I said, Chris was great as a guide, but everyone else was really nice and said hi. Obviously I wasn’t the first model railroad nut to be through there. It’s nice that they are all pleasant, even though they are trying to get their work done.

I think it was about 1:30 by the time we left. If you have the chance, it is a great outing.

Next stop – Kalmach Publishing. And I thought Walther’s was cool.

Till next time, Happy Railroading…

 

 

 

 

 

Road Trip…

So every year, about this time, my wife and I take a little road trip. We like to get away for several days (our anniversary and her birthday) and because we travel so much for work, we prefer to drive someplace rather than fly. There’s the usual places within a couple hours drive of the cities, but we’ve done them so many times that in the last several years we’ve been driving farther to visit places we haven’t been to.

This year we sat down to plan the trip and my wife said that she wanted to go to Milwaukee (no, she had no idea) and while she would plan lodging and meals, points of interest were up to me.

So I climbed onto the computer and started googling points of interest in the Milwaukee area (wait for it…) and as I writing down different things (don’t worry, it will occur to him) it suddenly came to me that two of the biggest attraction for a model railroader were in Milwaukee. Yes, Kalmbach Publishing and Walther’s.

I didn’t come right out and tell my wife that these would be the highlights of the trip for me, but I did manage to casually bring them up as we were talking about various sights to see. It’s knowing your audience folks, she was happy to tag along and excited that I could see them.

We left last Monday morning, with the plan being to drive out and get to the hotel late Monday afternoon, have dinner and a relaxing night. Then start the sightseeing on Tuesday. As she thought about it, my wife wanted to visit Walther’s first thing Tuesday morning. And you wonder why I love this woman. So Tuesday morning, with Siri giving us directions, we headed to Walther’s. Unfortunately I missed the part where they weren’t open on Sunday, Monday OR Tuesday. Yes, I was a little bummed, but the funny part was that my wife was absolutely devastated.

From there we headed off to the Milwaukee Art Museum. This would be the top pick for my wife. Don’t get me wrong, I love museums, it’s just that I prefer the old European masters and not so much the more contemporary art that the museum is known for. First of all the museum itself is beautiful, a piece of contemporary art all by itself.

Milwaukee Art Museum.
Milwaukee Art Museum.

Yes, those are wings and yes, they open and close. They also “flap” at around noon each day.

Once inside, as I was walking around the Modern section, I did find a couple of pieces that appealed to the railroader in me. First was part of a large wall collage.

Milwaukee Art Museum - part of a full wall collage.
Milwaukee Art Museum – part of a full wall collage.

The engine was a Raymond Loewy design for the Milwaukee Road. The guy designed just about everything that screams “Americana” from the twentieth century.

Next was a steam locomotive an artist had made. It’ nice to know that the art world can appreciate the beauty of the steam loco.

Milwaukee Art Museum - Steam locomotive as art, why not.
Milwaukee Art Museum – Steam locomotive as art, why not.

As I had said earlier, my wife had picked out the hotel. We were staying at the “Iron Horse Hotel” just south of downtown. Not sure how they came up with the name, but it is along side a couple of tracks. And some of the interior décor leaned that way.

Iron Horse Hotel - in the display case.
Iron Horse Hotel – in the display case.
Iron Horse Hotel - the locomotives tender.
Iron Horse Hotel – the locomotives tender.

It is a great little boutique hotel, and I would recommend it. Their signature burger is probably one of the best I have had. However, if you plan to stay there in the late spring, summer or early fall be fore warned. It’s a block from the Harley-Davidson museum and a mecca for bikers who they happily cater to. Right down to the approximately 4 dozen bike only parking spaces in front of the hotel.

But as I had said there were a couple of tracks right under our window and I was able to do some railfanning right from the room. Mainly transfer runs from one yard to another. You would always know when one was coming by as there was a grade climbing out of the yard and you could hear the engine working to climb it. And no, they didn’t work through the night. The latest I heard was at about 9:00 pm when a heavy freight pulled by a couple of big GE’s would leave the yard.

A couple of things I learned watching them are: modern tank cars have there reporting marks stenciled along the top and crews can be creative. Saw one CP geep with a 24 bottle flat of water on the short hood outside the windows to keep it cool.

Railfanning from the room.
Railfanning from the room.

I will have I post on Walther’s and Kalmbach in the next day or so, as I have a ton of pictures to go through before I write anything.

Just wanted you to know why I hadn’t gotten anything done downstairs this week.

Till next time, Happy Railroading…

 

 

Twin City Model Railroad Museum pt. 2…

This is an update to my Twin City Model Railroad Museum post from last October. As I had talked about in the post, the Twin City Model Railroad Museum had to vacate it’s space in Bandana Square because of a financial situation with the landlord. At that time they weren’t sure if they had anywhere to go or if they would simply cease to exist after 81 years.

Good News, the museum group has secured a new home and are already planning their move. Their new home is at: 652 Transfer Road in St. Paul, near what was the former Amtrack Station ( Amtrack has moved to the restored St. Paul Union Depot, where the club was originally located). They are already planning their move starting in March, with what they hope will be a grand opening in late spring. Pretty grand plans considering the size of the layout they have to move. And yes, I plan on being there when they open.

When the public heard of their situation, there was an outpouring of support for the club and they were able to raise $70,000 to help in securing the new location and finance the move. If you would like to help (and no, I am not affiliated with the group in anyway), you can check out their web site @ Twin city Model Railroad Museum ( tcmrm.org). I am sure they would appreciate the support.

As I had said, I was sad that I would not be able to share this with my grandson. I am happy that now I will, but I am happier that others will be able to experience a great model railroad and perhaps become involved in the hobby as well.

A Great Day, Happy Railroading…

 

Wiring Update…

You may be surprised to see this post as a wiring update, as I had planned to finish the track up to the New Brighton yard. Well, I hit a little speed bump and those plans changed. More on the “speed bump” in later as it deserves it’s own post.

Back to wiring. I pulled the buss wires for all most of the lower level, from New Brighton yard up to the town of Brandon. Through Brandon to the helix I am not sure yet of where the signal sections are and didn’t want to guess until the track is down. Below are a couple of pictures of the bus wires pulled and then hooked up to the terminal blocks. A couple of notes before the photos. First is a picture of the wires pulled and bundled, you should have seen the mess of wires before I got them all zipped tied together. Second, I originally figured I would have 8 signal blocks at most on the lower level, actually I now believe it to be 7, so I installed a terminal block with 8 posts. I forgot that there is a north and south track (14 posts), sidings ( another post) and the reverse loop (3 more posts). So I had to add in the second barrier strip along side the original. The color coding is as follows: black – common, red – north bound, white – south bound and green – sidings.

Buss wires in and awaiting installation to terminal blocks.
Buss wires in and awaiting installation to terminal blocks.
Buss wires terminating at terminal blocks in electrical cabinet.
Buss wires terminating at terminal blocks in electrical cabinet.
Wires pulled for the buss wires, the bundle is for blocks further down the line. The three (white, red and black ) are for this block.
Wires pulled for the buss wires, the bundle is for blocks further down the line. The three (wite, red and black ) are for this block.

After the buss wires were in I started installing the feeder wires. I started by following the tracks around and making a mark by each place one was to be installed. I also put a piece of tape on edge of the upper deck (more on this in a minute) and when I was sure that I had not missed any sections, installed the feeder wires. I drilled the holes and then pulled the wires down through the layout and out to the front edge using a piece of tape to secure them. The tape was a double check to make sure I didn’t miss any of the marks I had made and to hold the wires in place until I soldered them to the buss wires.

Hard to see, the little "V's" mark location of feeder wire locations.
Hard to see, the little “V’s” mark location of feeder wire locations.
The tape strips mark location of feeder wires, waiting for installation. It will all be clear to you soon.
The tape strips mark location of feeder wires, waiting for installation. It will all be clear to you soon.
Feeder wires installed, waiting to be soldered. Tape holds wires in place.
Feeder wires installed, waiting to be soldered. Tape holds wires in place.

Also while I was laying track I had marked the signal block boundaries, which helped when pulling buss wires.

Block end points marked on plywood.
Block end points marked on plywood.

On my last layout I had a rather complicated four digit code for the signal blocks, this time I kept it very simple. I did manage to  get one section of track wired to the buss, but had to call it a night.

First feeder wires soldered to buss wires.
First feeder wires soldered to buss wires.

 

Getting close, until then – Happy Railroading…

 

Mid January Update…

Welcome to my mid January update. I realize that it’s a boring title, but a bunch has happened and I wasn’t sure which topic to title this post with. But before I get started with what I’ve accomplished since my last post, I would like to get several complaints off my chest.

  1. Short of a home improvement store, do you know how hard it is to find basic Elmer’s white glue. It seems stores carry all types of glue but not basic white glue.
  2. Solder-on wire connectors. Everything is now crimp-on, ask anywhere for solder-on connectors and you get a blank stare.
  3. And solder. With Radio Shack going under and being reorganized there are far fewer around. They used to be everywhere, and now the closest is a bit of a drive from my house, so I called and the answer was…pause..I think we do.

On 2 and 3 above I asked the owner of my LHS (the hobby shop is his retirement career, his first was as an electrical engineer) as I figured he would now where to get them. His answer was on : #2: I have no idea, use crimp-on and solder them and #3: I’m not sure. So when wiring is started I’m using crimp-on connectors and soldering them. As far as solder, I ordered it online .

OK, got that off my chest, sorry.

First, I finished the cork roadbed up to where the cork sheets start in New Brighton yard and no, the cork sheets from Midwest Products have not shipped yet.

Cork roadbed in place up to the New Brighton yard.
Cork roadbed in place up to the New Brighton yard

Not resting on my laurels, I started laying the track. Starting at the switches for the reverse loop (probably because that’s what I had said I going to do in my last post) I headed north through Jackson. Originally, I figured I would lay the mainline, get it wired and come back and do the sidings. I found it much easier (and fulfilling) to do all the trackwork as I went along.

Track work continues.
Track work continues.
Proceeding through the north end of town.
Proceeding through the north end of town.

The work moved along well, the only thing that really slowed me down was the crossovers. The diverging routes of the turnouts all had to be cut down to fit the spacing between mainlines and sidings.  The track is a mix of weathered track (from the mainline of the old layout), non weathered (from the old staging yards) and a mix of weathered and new switches. The OCD in me can’t wait to get it all weathered.

I laid the mainline through Jackson and about half ways around the peninsula. Then I went back and started working from the reverse loop switches towards New Brighton yard. I got as far as fitting the tracks over the bridge in New Brighton. And then ran out of weekend.

The track work complete for the town of Jackson.
The track work complete for the town of Jackson.
Some of the buildings in place with the track work complete in Jackson.
Some of the buildings in place with the track work complete in Jackson.
Jackson, south looking north with the track work on place.
Jackson, south looking north with the track work in place.
Track work proceeding along the berm scene heading towards New Brighton yard.
Track work proceeding along the berm scene heading towards New Brighton yard.
Track work being installed over the bridge in New Brighton.
Track work being installed over the bridge in New Brighton.

But before I could leave it for the night, the OCD kicked in again. I understand the gaps between sections of flex track where the ties are removed is part of track laying, but again it bothers my sense of order. So I hauled out my old bag of ties. These are from BK Enterprises. I’ve had these for longer then I can remember and I’m not even sure the company is still around. I’m sure they are sold for those who have the time and patience to hand lay their own track, but they work great for replacing the missing ties. The great thing about them is that they are slightly thinner then the ties on the flex track and slide right under the rail joiners.

Gaps in the ties from track laying.
Gaps in the ties from track laying.
Gaps filled with BK Enterprises ties.
Gaps filled with BK Enterprises ties.
BK Enterprises railroad ties. Can't even tell you how long ago I bought these.
BK Enterprises railroad ties. Can’t even tell you how long ago I bought these.

I should have the rest of the track laid for the reverse loop (need to remember to finally pick up that AR-1) and the track up to New Brighton yard in short order. Then I will start running the buss and feeder wires and we’ll see about getting this to the stage of an operating model railroad. With the track work done in Jackson, I will have at the very least, a nice switching layout.

Until next time, Happy Railroading…

 

 

 

 

 

 

 

 

Looking Back and Looking Ahead 2016…

Welcome to the Looking Back and Looking Ahead 2016 edition. I reread my last years looking back, looking ahead post to see what I had accomplished and what didn’t make it last year. What I found was that when I started this site was –  that the first year I had pretty high expectations. And while I scaled it back for my second year , they were still pretty high.

The main three from the start of 2015:

FINISH THE CABINETS AND BENCHWORK. Can check this one off.

MINIMUM OF THE MAINLINE IN AND OPERATIONAL / BOTH LEVELS. That would be an obvious miss.

SOME TRACKWORK IN FOR TOWNS. Again,  an obvious miss.

While I believed that the above goals were accomplishable, looking back they were a bit optimistic. Factor in the job change in April that had us traveling almost every other week for a good part of the remainder of the year and they quickly became over optimistic. Even making the cabinet doors and having them installed before Christmas (that my wife had requested ) didn’t happen as not one, but two business trips suddenly got wedged into the time between Thanksgiving and Christmas. And yes my wife understood.

So what would I like to get done in 2016? Well… everything. But realistically I think I’ll shoot for the following:

  • New Brighton yard planned out and cork down.
  • All trackwork for the lower level in and wired.

Pretty simple list, but knowing that the work/travel schedule is not going to lighten up ( at least for the first half of the year ) I think that I should keep it realistic.

Where am I at right now on the list? I have the yard in New Brighton started, as far the track layout goes, however I keep tweaking it as I mentally operate it. The biggest problem I have right now with the yard is that when the track plan is finalized ( the next couple of days ) is that I won’t be able to lay the cork roadbed for it.

Why not ? Well it seems that Walthers ( walthers.com ) is having their “ biggest track sale of the year ” and one of the sale items is the Midwest Products ( midwestproducts.com ) cork sheets that I use for yards. They are out of stock with an unknown restock date. I have to wait till  Walthers restocks and ships.

I won’t halt work until that happens, instead I will start the trackwork. The starting point will probably be where the switches are for the return loop and work towards the helix, wiring as I go.

I am finding that I need to actually get trains running or I am going to start loosing interest/focus with the layout. Not a good thing.

Additional things on the list could be:

  • Start the helix once track is in. At minimum I will cut the wood for the helix when the weather gets warmer.
  • Cabinet doors. No, my wife won’t let this one slide, but I should be able to put it off again till the weather is better (not winter).
  • Install the supports for the upper level valance/ lights.

Am I unhappy that I didn’t make my ( self imposed ) goals, sure, I had hopes of having things running by now. But over the last weekend as I was reading other modelers year end updates I have found that there are others who after 4 to 6 years are just finishing their mainlines. After a year and a half I’m not doing to bad.

I will have an update on New Brighton yard soon.

Till then, Happy Railroading…

Happy New Year…

Wanted to say Happy New Year to all of you out there and thank you for a great 2015.

A quick note about my last post ( The Town Of Brandon ). It was written 2 weeks ago, but because of some glitch in some program somewhere. I was unable to post it until last night. Kudos to all who tried to help fix the problem ( customer support at WordPress, the company hosting the site and my son, who teaches coding, game design and other a variety of other computer programs.)

I have made progress in New Brighton, although as I keep planning I am finding ( what I hope ) are better alternatives to what I originally planned. Will have a post on that in the next day or two.

I will also have a year end update in the next couple of days. What I have accomplished, what I didn’t and what I hope to get done in the coming year.

And again, Happy New Year, I hope it’ a great one for you!