Installing Main Street in New Brighton…

As well as trying to figure out the yard in New Brighton, I have been also working the other side of the aisle. As I have built the individual blocks for my main street along the berm, I hadn’t actually glued anything down. Because all the buildings are close to done and some waiting final installation for the last details, now was time to get the road in.

I used Walther’s road system (Walthers.com) for the city streets. Mainly because it mates up to the railroad bridge. Plus I figured I wouldn’t be scrimping on width for a city street and the sidewalks work with it. Pretty much a win all the way around. One word of caution, the concrete sections have beveled edges so when glued together give the appearance of individually cast sections. Mix these with asphalt sections, because you have both and aren’t paying attention, and you will have some filling to do to even things out.

I had already made the block sections as I built the buildings, so it was just a matter of gluing these together and down to the plywood. In the past I have used contact cement for this. It will hold anything down, forever. But, you have to wait for it to dry before joining the pieces together and like I said you never get it apart. I now have a new best friend for this job. Canopy glue. The first brand I had was RC56, the current bottle is something56, don’t know the name but they all seem to use 56. So far it is holding beautifully and I haven’t knocked anything loose.

When planned the road the idea was for one complete half plus a partial on the other half. The main reason was so at the intersection of Main street and the street under the railroad bridge, I could have the Walther’s working traffic light without it hanging in space.

Prepping the town for actual road installation.

I glued down the main sections and you can see that there is about a 1 inch strip that I needed to cut and fit. Starting on what would be the north end of the street and working south I started to cut and fit the pieces in place.

I started fitting the outer sections that require a lot of trimming on the north end and worked south.
Working my way south on Main Street. You can see just past the super market where I have cut and fitted the outside road sections and the pieces waiting for their turn.

I just continued down the street till I got to the end where the road T’s.

South end of the main strip in, filled, sanded and ready for paint.

As you can see I was also doing a little filling of cracks and sanding as I went. Now I need to mask off the fascia and surrounding areas and paint the street and sidewalks.

A couple of other things done. after getting the street in I also put in the foundations for the houses on the north end. with these in place I can put in the plaster yards and start the scenery at that end.

Foundations and sidewalks in for the houses.

In addition to those I have finally settled on which buildings will be on the far side of the railroad overpass.

Final buildings chosen for the background. (Far side of the bridges)

On the right side of the street, not that visible, are a bar and a movie theater. They were chosen for this space because they both have one sided Miller Engineering (microstru.com)  signs on them and won’t work else where. And on the left is a Heljan (heljan.dk) building. It was part of a brewery complex, one of those things you pick spur of the moment, that hasn’t found a home yet. The scale looks off to me. Bigger then N scale but smaller then HO scale. In the background it looks right.

And that’s what I’ve got for now, till later…

 

 

 

 

Planning New Brighton Yard…

One of the things I have been working on is planning the New Brighton Yard. You may have thought that I had it planned out. After all I had the main line in and running through. I also had a number of full industries as well as background buildings set in place. But there was never a full plan.

I knew what I would like to have, but the space just isn’t there. I could get close to what I want but it would mean removing the engine service facility. Which wouldn’t be a deal if I was running diesels and didn’t need to turn them. But I’m not, I’m running steam and you have to be able to turn them around.

Or I could wrap it around the other end but that would cut into the staging yard. Nope, it’s never going to be a full classification yard. With that realization I have been moving ahead with the space.

One of the first things I did was to pull the background buildings out. While they do present switching potential, they use up a lot of space. Both physically and the room you need for the trackage and turnouts to service them. The full industries, the dairy, stockyards, power plant and a as yet to be named industry, will stay.

With the background buildings:

Another view of New Brighton Yard.

And with them pulled:

South end of the yard.

As you can see in the above photo I have my photocopied turnouts set in place for the ladder. Below is a better picture.

Overall view off New Brighton yard with turnouts set in place.

You will also note that there is a double slip switch at either end of the yard. Now I don’t like to use them any more then the real railroads liked to, but they do make other aspects of the yard work. For example, by having the one closest to us in the picture, I am then also able to have a switching yard lead so as not to block the mainline.

As it sits now I believe this is the way the yard will be. Not totally happy with it, (and won’t be till I magically gain more space) but for now it will do. I will probably hold of ballasting the track until I have used the yard for a while, just to make sure it works. Or if some tweaks need to be made.

As far as background, I will be putting in some very shallow non rail served buildings in to serve as a backdrop.

Next is pick up some turnouts and lay some track and see if it will work.

Till next time, Happy Rairoading…